Published On: Thu, Aug 16th, 2018

I-70 Ramp Closures at US 40 for Continued Bridge Work

RICHMOND, Ind. – The Indiana Department of Transportation announces ramp closures from I-70 to US 40 for crews to continue bridge work.

Crews are scheduled to resurface the bridge and put in new bridge approaches on I-70 over US 40.

I-70 eastbound ramp to US 40 East (exit 156B) will be closed from Sept. 8 through Sept. 14. Then, crews will reopen that ramp and close I-70 westbound ramp to US 40 West (exit 156A) from Sept. 15 to Sept. 21. Crews will be working around the clock to get the ramps open as soon as possible.

Traffic on I-70 near the project will be restricted down to one lane in each direction as work is taking place. Motorists should expect long delays on I-70 during this work and are encouraged to find an alternate route. An alternate route will be marked using  US 27, US 36 and US 127 for motorist who want to avoid the back-ups on I-70.

INDOT reminds motorists to slow down and pay attention in work zones.

I-70 Ramp Closures at US 40 for Continued Bridge Work.

Leave a comment

You must be Logged in to post comment.